Implementation of IEC 61850 GOOSE and Protection Relay Testing


IEC
Time

Implementation

GOOSE

61850

GOOSE SE GOOSE O O G OSE O G GOOSE GOO GOOSE SE GO E S OS O O E G GOOSE SE GOOSE O O G GOO OSE SE O G

by Hachidai Ito and Kenichiro Ohashi , Toshiba Corporation, Japan

40 41

of

High Performance

and Protection Relay Testing
Transformers

EAF

IEC 61850 GOOSE messaging is applied for Substation Automation Systems and for status interactions between IEDs by replacing the conventional method of using binary inputs/outputs and wires with communication over Ethernet cables/fibres. With its fast transfer characteristics, it is also applied for In
IEC 61850, the new communication standard for power substations, is now being widely used in practical applications. In particular, GOOSE (Generic Object Oriented Substation Events) messaging has been applied not only for SAS (Substation Automation System) control and monitoring of primary equipment and IED status, but also for status interactions between IEDs including protection relays by replacing the conventional method of using binary inputs/outputs and wires with communication by GOOSE messages over Ethernet cables/fibres. This is achieved through much simpler engineering based on the multi vendor interoperability described in the IEC 61850 standard, which enables the easy connection of different IEDs, including relays supplied by different vendors.

GOO protection testing purposes. SE

order to confirm the basic functionality of IEC 61850 and GOOSE messaging, conformance tests are mandatory for basic multi-vendor interoperability.

PAC.WINTER.2008

protection

by Hachidai Ito and Kenichiro Ohashi , Toshiba Corporation, Japan

42

protection

Hachidai Ito was born in Osaka, Japan, in September 15, 1956. He joined Toshiba in 1981, and worked as a development engineer and a manager of Protection and Control Development Department. He is now a Chief Specialist in Power System Protection & Control and is principally responsible for technology and overseas marketing of protection and control products in Toshiba Corporation. He is a senior member of IEEE, and a member of CIGRE, IEEJ and IEICE. Also he is a secretary of Japanese National Committee of IEC/ TC95, a convenor of its MT1 (Maintenance Team 1) and a member of its other 3 working groups, and also a member of several working groups in IEEE/PSRC...

In order to confirm the basic functionality of GOOSE messaging in protection relays, functional conformance testing at an independent test laboratory is mandatory for multi vendor interoperability. However, an IEC 61850 device certificate does not fully ensure conformity to the IEC 61850 standard. Furthermore, in some cases, the correct behaviour of an IED is not clearly described in the standard. Hence, performance testing for GOOSE messaging must be considered as an important item in the product type test and/or the routine test because this is critical for practical substation applications. It should be noticed that performance testing for GOOSE messaging is not covered by conformance tests at present. In order to replace the conventional method of using contacts and wires, the performance of the GOOSE messaging, i.e. transfer time should be less than 3ms for a Trip GOOSE command and 20ms for a Block GOOSE command as specified in IEC 61850-5 'Communication requirements for functions and device models’. It is clear that new methods for testing GOOSE messaging including performance and interoperability must be carefully considered, not only by vendors but also by the end users who evaluate system performance in the field. GOOSE APPLICATIONS FOR PROTECTION Advantages of GOOSE for protection devices GOOSE messaging is a very important function in achieving multi-vendor interoperability as described in IEC 61850. The purposes and associated advantages are considered as follows: Instead of connecting conventional metallic wiring and other ancillary equipment between protection devices, or between protection devices and primary equipment, only a single LAN cable/fibre is required. This results in a reduced total cost of building a system in a substation.

Connection between IEDs provided by different vendors is much easier to achieve. Modification or addition of data communications between IEDs can be easily achieved by the simple re-configuration of the IEDs’ GOOSE settings, rather than by complex metallic wiring. Figures 1 and 2 show an example of the differences between the conventional method and that utilising GOOSE messages where communication between a protection relay and a primary CB (Circuit Breaker) is required for an Autoreclose function. Possible GOOSE application for protection and related ongoing activities GOOSE messaging in IEC 61850 can also be utilised in the following protection functions: Autoreclose (between relay and CB) Intertripping (between relay and relay) Interlocking (between bay control unit and relay) Some utilities consider and plan contingencies in the case of a protection failure in a system. In order to minimize the damage caused in the case of a primary fault to the zone protected by the equipment that has failed, messaging between protection relays is very important. This subject is being discussed in CIGRE/SCB5/WG16: Busbar protection. There is a possibility to use GOOSE messages for information communication between the various items of equipment contained within the substation ACHIEVING INTEROPERABILITY Functional conformance test See Figure 3. UCAIUG (http://www.ucausersgroup.org) defines the conformance test procedure which is detailed in IEC 61850 part 10 (Conformance testing). The test procedure contains two types of test;

IEC 61850

11

Connections between Relay and CB by conventional methods

Connections between Relay and CB by GOOSE

2 2

Protection Relay

Binary output Trip/Autoreclose Binary input Primary CB CB Condition Dedicated metalic cable (s) A LAN cable GOOSE for Trip/Autoreclose
100 BASE/10 BASE HUB

GOOSE for CB Condition

PAC.WINTER.2008

by Hachidai Ito and Kenichiro Ohashi , Toshiba Corporation, Japan

43

Conformance with the performance criteria defined in IEC 61850-5 should be tested.
Positive test: Checks with correct parameters. Negative test: Checks with incorrect parameters. However, there are some points that we must be cognizant of with regard to conformance testing; ‘Conformance’ does not mean ‘Interoperability’. Only basic functional tests are undertaken, no performance tests are carried out at present. IEC 61850 communication interfaces in the IED form the main part of the test, but the connections between prot ec t ion applic at ions and their IEC 61850 communication interfaces are too complex and varied to be comprehensively tested. Regarding standardisation and guidance on testing, functional testing of IEC 61850 based systems is now being discussed in CIGRE Subcommittee B5 Task Force 92. The technical brochure will define the functional aspects of testing which are not defined in IEC 61850-10 (Communication networks and systems in substations -Part 10: Conformance testing). It deals with the functional parts not covered by the IEC 61850 device certificate which is based only on IEC 61850-10. This will have an impact on the work of the protection engineer, and this kind of functional testing approach should naturally be carried out for all existing IEC 61850 conformant devices and systems.

Importance of performance testing for GOOSE messaging In order to achieve multi vendor interoperability in GOOSE messaging in consideration of an actual practical situation within a substation, it is important that not only the functional conformity to IEC 61850 be tested, but also performance conformity to IEC 61850 must be tested, by vendors, as a type test of the IED. Performance criteria examples of GOOSE messaging defined in IEC 61850-5 'Communication requirements for functions and device models’ are given as follows: 3ms: ‘TRIP’ GOOSE information (class P2/P3) 20ms: ‘BLOCK’ GOOSE information (class P2/P3) The transfer time definition is described in IEC 61850-5 (see Figure 4). IEC 61850-5 states that the transfer time of GOOSE messaging for a Trip command shall be such that the command should arrive at the destination IED within 3ms. For a single IED, by assuming the time for the publishing process and the subscribing process are approximately equal and if ‘tb’ can practically be ignored, then at least half of the defined time is needed for the IEDs to process the message (i.e. 1.5ms for ‘TRIP’ GOOSE). See Figure 4. PROTECTION RELAY TESTING USING GOOSE Comparison with the conventional method Figures 5 and Figure 6 simply show the difference between the conventional test method used to measure tripping time and the method used to measure the ‘Trip’ GOOSE transfer time using an IEC 61850 GOOSE enabled test set. In order to simulate network traffic, possibly caused by other equipment connected to the same network, a network traffic simulator running on a PC is used. It is considered very important for the product type test to have a similar environment to that found within the

Kenichiro Ohashi was born in MiyagiPref., Japan, on March 5, 1973. He joined Toshiba in 1995. He is currently responsible for product development of protection and control systems as a quality assurance/testing engineer in Toshiba. He is a member of IEC/TC95/MT2 (Maintenance Team 2: EMC standards for measuring relays and protection equipment).

3 2

An IEC 61850 device certificate

GOOSE transfer time IEC 61850 -5
Transfer time t = ta + tb + tc ta tb tc

4 2

The UCA International Users Group defines the conformance test procedures required for issuing IED conformance certificates.

f1

Communication processor

Communication processor

f2
GOOSE transfer time is the time between

Physical device PD1

Physical device PD2

fuctions in two devices

PAC.WINTER.2008

IEC 61850

protection

by Hachidai Ito and Kenichiro Ohashi , Toshiba Corporation, Japan

44

protection

Implementation and test results satisfying the performance criteria are described along with methods for evaluation.

substation, and this is a key point in GOOSE testing. See Figure 5/ Figure 6. The advantages in testing with GOOSE messaging are considered as follows: Dedicated metallic cables in the connection between the relay and test equipment and/or cables used for testing can be reduced. Performance evaluation is more accurately achieved in GOOSE messaging since hardware overhead time on conventional binary inputs/outputs can be ignored. The limitation in the number of binary inputs/ outputs can be covered by GOOSE. The timing of all GOOSE can be monitored by an external IEC 61850 protocol analyzer connected to the network. Expanding flexibility in testing with GOOSE IEC 61850 GOOSE, with its fast transfer characteristics within a network environment (<3ms as defined by the standard), is now being widely used for protection purposes in place of conventional dedicated wiring. As described, this brings great benefits to the user since dedicated wiring can be reduced.

In the same way, GOOSE can be applied for testing purposes. All signals, even those used internally in the execution process of software for a numerical protection relay, can be assigned to GOOSE. This results in reduced wiring during testing and also facilitates the realisation of more detailed testing. Figure 7 shows a practical example of the test result of a switch-on-to-fault case utilizing GOOSE for a certified IEC 61850 conformant numerical transformer protection relay. In this case, the COMTRADE waveforms calculated by RTDS with a simulation of both CT saturation and transformer inrush under a switch-on-to-fault condition were played on a test set. At the same time the relay’s internal signals for 2nd harmonic inrush current detection and CT saturation detection which are used to block tripping were observed along with the trip signal, without any wiring connection but by monitoring GOOSE messages on the network. The waveform can be seen to consist of fault current and transformer inrush components. In response to this unusual waveform, the relay firstly detects second harmonic to temporarily block tripping and then subsequently issues a trip, which is considered to be the expected result. In the past, there would have been many limitations in the flexibility of this kind of test, e.g. resulting from the delay time of mechanical contacts. PERFORMANCE AND ITS EVALUATION GOOSE messaging implementation to achieve satisfactory performance It is important to minimize the transmission time of the GOOSE packet within the IED in order to achieve the GOOSE performance of class P2/P3 which is defined

IEC 61850

15
Communication messages replace hardwired signals between a relay and test device.

Example of physical connections for a conventional test
Protection Relay Testing Tool

Example of physical connections for GOOSE based test
Protection Relay Network traffic simulator Testing Tool

6 2

Binary output Trip/Autoreclose Binary input

GOOSE for Trip/Autoreclose Binary input CB Condition Binary output
HUB

GOOSE for CB condition

Voltage/Current Dedicated metalic cable (s)
Test Device

Voltage/Current A LAN cable
Test Device

PAC.WINTER.2008

by Hachidai Ito and Kenichiro Ohashi , Toshiba Corporation, Japan

45
in the standard. One area in which we have been able to make significant savings in processing time is in the way in which we process the sending and receipt of GOOSE messages. Another opportunity was taken to reduce the time overheads incurred between the GOOSE packet receiving process, the interpret/response/generate GOOSE packet process and the sending process. Implementation of the application software is designed such that the three processes referred to above are executed in series in a task activated in a very short period of time together with the primary protection/measurement etc. functions as shown. See Figure 8. Methods for performance evaluation in GOOSE communication Figure 9 and table 1 show a test result for the ‘Trip’ GOOSE transfer time in a certified IEC 61850 conformant numerical distance protection relay as a performance type test. An IEC 61850 GOOSE enabled test set is used with 0.1ms resolution. During the performance type test of an IED, transmission traffic must also be considered. By calculating the maximum possible traffic on the LAN to which the IED is intended to be connected, or stating the maximum traffic value for which the IED can either publish or subscribe to GOOSE within the specified time, the performance criteria must be stated by the vendor. In practical situations, there are many kinds of GOOSE published by other IEDs and by primary equipment. All of these frames and also frames of other protocols could be on the same LAN network simultaneously. This point must, therefore, be considered when the possible maximum network traffic is calculated. A performance calculation example is also included in Appendix I of IEC 61850-5. Table 1: An example of the test result for GOOSE transfer time.

Simplified sequence model of procedures in a time crucial proces
GOOSE packet receive IED primary process GOOSE packet send

8 2

It is important to reduce the time between the GOOSE receive and response.

Table 1 Test results for GOOSE transfer time
Network Traffic (*1) (*2)
50 Kb/S 100 Kb/S 200 Kb/S

Maximum response time of GOOSE (*2)
< 0.7 MS < 0.7 MS < 0.7 MS

Autoreclose by GOOSE (*2)
Successful Successful Successful

*1 Simulated only by GOOSE which were all captured and processed by GRZ100 at the same time *2 Test condition/hardware configuration is same as Figure 6

Table 1 shows an example of the test result for GOOSE transfer time (‘ta’ in Figure 4) and of the result of Autoreclose utilizing GOOSE for all interaction signals in a certified IEC 61850 conformant numerical distance protection relay with simulated network traffic.

Example of utilizing GOOSE for protection testing purpose

7 2

Trip GOOSE transfer time measurement results

9 2

PAC.WINTER.2008

by Hachidai Ito and Kenichiro Ohashi , Toshiba Corporation, Japan

46

protection

As another aspect of performance evaluation for a single IED, the GOOSE response time shall be checked since it directly affects the system performance. As part of system evaluation, an easy way to test the response time of an IED could be by the ‘Ping-Pong’ technique as described below. This method is very efficient because it can check the subscribing time (‘Tc’ of Figure 4) and publishing time (‘Ta’ of Figure 4) at the same time without other external inputs or triggers. Set the IED to publish GOOSE (A) when GOOSE (B) is subscribed. Arrange external equipment connected to the LAN to publish GOOSE (B). Observe the behaviour of GOOSEs with external equipment connected to the LAN. Figure 10 shows the test result of an IED, a certified IEC 61850 conformant numerical distance protection relay, with an IEC 61850 GOOSE enabled test set. As shown, the response time here is sufficiently fast to adhere to the requirements defined in the standard (Figure 10). However, as it is only a single test result then to actually verify the performance, we must repeat the same case at least e.g. 100 times and check the maximum response time under simulated network traffic. As an extension of these procedures, this ‘Ping-Pong GOOSE’ can be played continuously between two or more IEDs without any external equipment. In case of two IEDs, the same settings as shown above are sufficient with the exception of exchanging GOOSE (A)/GOOSE (B) and inverting their logic at one IED. An IEC 61850 network analyzer could observe the continuous ‘Ping-Pong GOOSE’ rally, and as for evaluation, it is only necessary to determine how many GOOSEs were issued to the network in a certain time period, i.e.

[ Time period ] / [ Number of GOOSE issued ] = [ Average response time ] Here is a test result captured by an IEC 61850 protocol analyzer, which was carried out between two certified IEC 61850 conformant devices (Figure 11). Furthermore in this case, once the ‘Ping-Pong’ is set, the IEDs start playing ‘Ping-Pong’ as soon as the IEDs are connected to the network. Therefore, it could be used also for the purpose of increasing the network traffic. Note that cases utilizing GOOSE introduced here can be basically also applied to all IEC 61850 conformant devices which support the service for GOOSE. In order to obtain the expected benefits of IEC 61850 it is of critical importance to apply IEDs which provide sufficiently high performance of GOOSE messaging.

IEC 61850

IEC 61850 GOOSE messaging is now widely used in substation applications replacing methods using binary inputs/outputs and wires. GOOSE messaging performance evaluation for certified IEC 61850 conformant devices is one of the critical issues in achieving required substation functions such as sending trip commands or exchanging interlock status.

To obtain the expected benefits of IEC 61850,it is critical to apply IEDs with sufficiently high performance of GOOSE messaging.

Single 'Ping-pong GOOSE' for performance evalation of an IED
Protection Relay Test Device with IEC 61850

10

Rally of 'Ping-pong GOOSE' between two IEDs
Protection Relay Protection Relay

11

2. GOOSE (A) 1. GOOSE (B)

GOOSE (A) GOOSE (B)

PAC.WINTER.2008


相关文章:
Implementation of IEC 61850 GOOSE and Protection Re....pdf
Implementation of IEC 61850 GOOSE and Protection Relay Testing_电力/水利_工程科技_专业资料。IEC Time Implementation GOOSE 61850 GOOSE SE GOOSE O O G OSE ...
数字化变电站继电保护测试技术的分析研究_图文.pdf
testingtechnologyofrelayprotectionfordigitalsubstation ...Abstract:WiththeimplementationofIEC61850standardandthe...PWF.2T可以接收数字继电保护设备发出的GOOSE动作信号...
智能变电站继电保护装置一键式测试方法及系统.pdf
Discussion on the implementation of digital ...of testing for relay protection equipment [J ]....relay protection ; IEC61850; GOOSE ; digital signal...
数字化变电站继电保护测试技术的分析研究.pdf
testing technology of relay protection for digital ...implementation of IEC 61850 standard and the ...PWF-2T 可以接收 数字继电保护设备发出的 GOOSE ...
OMICRON测试仪在数字化保护装置测试中的应用.doc
Protection and Control Vol.38 No.12 Jun.16, ...GOOSE :;;; 中图分类号: TM774 文献标识码:A ...et Strategy for implementation of IEC 61850 in ...
OMICRON测试仪在数字化保护装置测试中的应用.pdf
characteristicsoftheIEC61850-92sampledvaluesoutputbyprotectiverelaytest,itnetworkprotectiontest OMICRONTestandGOOSE.Combiningtheapplicationofdigitalto liststhree...
基于IEC61850的继电保护测量自动测试工具的设计与实现.doc
关键词:继保测试;自动测试;测试系统;IEC61850 Design...at the testing of digital relay protection device...The implementation idea, framework and technical ...
GOOSE实时通信的分析与实现.pdf
Protection and Control 电力系统保护与控制 Vol.37 ...Key words: IEC61850; GOOSE service model; ...Implementation of the Products by Using IEC 61850...
基于协同测试系统的智能变电站GOOSE虚端子关联检测研究....pdf
(Configured lED Description)ofrelay.protection ...protectiondevicesbased IEC61850 on line.GOOSEvirtual...testingsystemisdetailed.Thefeasibilityandeffectivityof...
CMC-353-Technical-Data-ENU.pdf
protection testing and the commissioning of SCADA ...61850 GOOSE?4 Simulation Potential-free relay ...“Implementation Guideline for Digital Interface to...
Brazil_CIGRE_61850 Migration_and_Testing.pdf
(e.g. Relay1) Physical Device (network address...enhanced Control GOOSE, GSSE, and GSE Management...effort to improve implementation of IEC61850 ? Provide...
西门子IEC61850实现方案.pdf
protection, communication and control of substations...IEC 61850-GOOSE Reverse Interlocking Using the ...implementation of “substation wide switchgear ...
2008 IEC 61850 GOOSE Used for Wide-Area Monitoring and Cont....pdf
2008 IEC 61850 GOOSE Used for Wide-Area ...Testing at SCE demonstrates the successful use of...implementation issues of several popular and ...
基于IEC 61850标准的数字化保护动模测试系统_图文.pdf
intheaspectoftestmethods.Theideaandimplementation...因此采用GOOSE网结构的方式进行通信(IEC61850.9.2)...ProtectionTesterBasedon Relay IEC61850[J1.Relay,...
数字化变电站的GOOSE网络测试.pdf
Protection and Control 电力系统保护与控制 Vol.37 ...implementation which is based on GOOSE communication...of GOOSE IEC 61850 标准中定义了 GOOSE 通用变...
IEC61850数字式继电保护测试仪的检测及技术分析.pdf
IEC 61850 digital relay protection testers and the...items , platform , tools , criteria for testing...数字式继 电保护的测试需要测试人员对 GOOSE 控制块...
基于IEC61850_9_2及GOOSE共网传输的数字化变电站技术应....pdf
Protection and Control 电力系统保护与控制 Vol.38 ...16, 2010 基于 IEC61850-9-2 及 GOOSE 共网传输...WANG Song. A GOOSE network scheme for relay ...
IEC61850配置文件工程化测试探讨.pdf
IEC61850,technicalspecificationofDL/T860inengineeringandrelayprotectionmodelsofIECare 61850inengineering,thenecessarytestingitems putforward.UsingVC++6.0 andMSXML ...
OMICRON继电保护测试仪功能介绍(CMC356_CN)_图文.ppt
GOOSE, IEC 61850-8-1 Protection Relay Test Set SV, IEC 61850-9 WLAN WAN LAN 测试 IEC 61850 IEDs > IEC 61850 GOOSE 测试 > 订阅与模拟 > 映射 >...
基于IEC61850的光数字继电保护测试仪的研制_图文.pdf
ofrelayprotection tester’S principleandhardwaretO structure based on IEC61850...抽象模型:采样值传 输(SAV)模型和通用的以对象为中心的变电站事 件(GOOSE)...
更多相关标签: