Design and Construction of the 3.2 Mev Cathode Assembly for Darht II


DESIGN AND CONSTRUCTION OF THE 3.2 MEV CATHODE ASSEMBLY FOR DARHT II*
C. Peters, S. Yu, S. Eylon, W. Ghiorso, E. Henestroza, Lawrence Berkeley National Laboratory, Berkeley, CA 94720

1 INTRODUCTION
A 3.2 MeV injector has been designed and built for the second axis of the Dual Axis Radiographic Hydrodynamic Test (DARHT) facility at Los Alamos National Laboratory. Darht-II accelerator is a linac which produces a 2000 ampere electron pulse with a flattop width of at least 2-microseconds and emittance of less than 0.15 π cm-rad normalized. The installation of the injector system is presently underway and commissioning is expected to begin in December 2000. The design and construction of the injector was completed by LBNL. The Marx Generator was designed and built under subcontract to LBNL. The installation of the insulating column will be occurring during August 2000. The Darht-II injector High Voltage Column and Cathode Assembly are housed within a 4 meter diameter by 9 meter tall vacuum enclosure. The cathode assembly is supported on top of a vertically oriented insulating column. This arrangement is shown in figure 1.

emittance requirements for the accelerator. This requires a source of sufficient size, current density, and current uniformity. The source must maintain accurate alignment to the accelerator. The shroud must have accurate geometry for beam electric focussing, must withstand high electric fields without breakdown, and must be accurately positioned with respect to the source. Additionally, the cathode assembly gas load must be -8 consistent with the 5x10 torr pressure requirement for the Injector. Provisions must be designed into the cathode assembly for easily maintaining the source, shroud, and associated utilities.

3 DESIGN
The arrangement of the source, shroud, and bucking solenoid is shown in Figure 2 and is referred to as the Front End Assembly. The source is a 6.5 inch diameter Osmium/ruthenium (M type) coated dispenser cathode with ohmic heater assembly and is similar to the sources used in klystrons. The heater is a single toroid of 0.100 inch diameter wire with center return. The design and temperature uniformity analysis was done under subcontract to LBNL. Predicted uniformity is ±10°C. The goal for current uniformity and density is <5% and 9.4 2 A/cm , respectively. These expectations are modest and are based upon ETA and more recent RTA experience. A cathode test stand at LANL will run a production source at full operating conditions starting in September.

Figure 1 - Column and Cathode Assembly in Vacuum Enclosure

2 REQUIREMENTS
The basic requirement for the cathode assembly is to provide an electron source that meets the current and
*Work supported by the US Department of Energy under contract DE-AC03-76SF00098

Figure 2 - Front End Assembly

The shroud is a 66° pierce design with an overall diameter of 1 meter. The peak field stress on the shroud surface is 120 kV/cm. The basic shape was formed by spinning, followed by CNC profile cut, and a final polish to achieve a 4-8 ?in surface finish. The shroud is 317 stainless steel and has a copper disk (of 60 cm O.D.) brazed to the back (inside surface). The copper enables uniform heating of the high field area of the shroud to 200-250°C. This temperature is a compromise between the need to reduce barium plating on the shroud surface and at the same time reduce current emission from the shroud surface. The shroud is supported from a copper spool bolted to inside of the shroud. This spool also forms the inside edge of the piece surface. The temperature of this knife edge is low due its high thermal conductivity even though it has a 0.5mm gap to the 1100°C source. The 350 watts required to maintain the shroud at 200250°C is captured from the sides of the source. The cylindrical shields around the source and the I.D. of the copper support, which has a UHV compatible black oxide coating, are designed in order to achieve the required radiant heat transfer. The base of the source is supported by a stainless steel tube. The “hot” end of this tube is slit lengthwise to enable accommodation of the thermal expansion mismatch between the moly source base and the stainless steel tube. The source will periodically be removed for maintenance or replacement. Source removal requires shroud removal. The shroud may also need to be removed for maintenance and for access to instrumentation and hardware contained within the cathode assembly. Both the source and the shroud are mounted on tapered flanges, which provide easy disassembly and precise and easy reassembly. The shroud “knife edge” is aligned to the edge of the source surface in the hot condition to ± 0.1 mm. Relative motion between these edges from cold to hot is predicted by the FEA model and taken into account in the cold geometry. At the “cold” end of the source support tube are 12 pie shaped current viewing resistor assemblies, which enable determining the magnitude and uniformity of current flow to the source. These assemblies are thin sandwiches containing stainless steel strips and kapton insulating sheets. The source and shroud support tubes are mounted to a 1 meter diameter base plate which is water cooled via drilled internal passages. To the upstream side of this plate is mounted the solenoid bucking coil. The solenoid coil contains 12,000 amp-turns of 2mm solid square copper wire potted into a solid core. The 1500 watts of heat produced is cooled through water flowing over the I.D. and O.D. of the coil. The magnetic centerline of the coil was aligned to the source and shroud assembly at assembly.

for this Front End Assembly is to be aligned to the accelerator centerline to within 0.2 mm in offset and 1 mrad in tilt. The long support path from the cathode assembly to the floor of the injector bay and back up to the accelerator centerline is about 60 feet. It is not possible to achieve the desired alignment accuracy for the cathode assembly through a simple passive support structure. Cathode position may be effected by building motion or by thermally induced structural changes. An active computer controlled alignment system has been built and tested. The cathode assembly is supported by a hydraulically actuated hexapod. The position of the cathode with respect to the accelerator is measured using a system of lasers and detectors. Laser beams are reflected off mirrors mounted on the cathode assembly back onto position detectors mounted on the anode assembly. An algorithm computes cathode position errors based on the detector signals and computes hexapod strut length changes to correct the cathode position. Each hexapod location corresponds to a unique set of actuator strut lengths. Solenoid valves are then controlled to produce actuator length changes to achieve the computed target lengths. Actuator speed is about 0.001 inch/sec. Actuator lengths are known through linear potentiometers mounted on each actuator. After reaching target lengths the cathode position is re-read and the process continues until alignment of the cathode is within set tolerance. The final system works quite well; it converges and holds indicated position to ± 0.05mm. Presently, for sub-millimeter corrections, the control system takes 1-3 minutes to move into the aligned condition. Figure 3 shows a photo of the Hexapod assembly.

4 CATHODE ALIGNMENT SYSTEM
The source, shroud, and solenoid elements are aligned to each other as described above. The requirement goal Figure 3 - Hexapod Assembly During Testing

There are 4 laser and detector pairs in the system. The TILT detector retro reflects the beam off a flat mirror and detects pitch and yaw errors. There are 2 XY-ROLL position detectors, which reflect off corner cubes. The reflected spot position moves 2x the cathode move. The Z detector incident and reflected laser beams form a 22° included angle and reflect off the same flat mirror as the retro reflector. The laser diodes reside in small enclosures mounted to the vacuum vessel anode area. Short fiber optic cables connect to the 4 beam output lenses. These components are shown in figure 4

Eventually, it may also turn out that there are reasons folks may want to run the injector with the cathode in positions other than the nominally aligned condition. The alignment system provides a way of accurately repeating cathode position in relation to the anode.

.

Figure 4 - Laser Alignment System Schematic

The actuators utilize welded 3 inch diameter bellows and have a ± 1.4 inch stroke which produces a ±1 inch X, Y, and Z travel for the cathode. The hydraulics work well in UHV since there are no elastomeric or sliding seals in the design. Hydraulic actuation was chosen over electrically actuated struts due to concerns over induced voltage and noise during injector operation. The working fluid is water at 100 psi. The actuators are single acting since loads are one directional and essentially constant. Auxiliary springs are used to supplement and help equalize actuator forces. Pressure is supplied through a small piston pump and accumulator combination. Compact commercial solenoid valves are used to control water in and out of the actuators. Pump and valves are housed within the marx dome inside the marx generator tank. Fluid lines and potentiometer signals are fed through the 5 meter current stalk which runs through the high voltage column into the vacuum space where the cathode assembly sits. Initializing the alignment system at diode installation is fairly simple. The cathode is aligned to the anode at installation through use of a fixture, which physically mounts between the two assemblies and reads offset and tilt directly with dial indicators. The laser system is turned on and the PID outputs recorded. The control system compares PID signals to these reference values to determine misalignment. During injector commissioning, the passive cathode position behavior will be observed and a best practice schedule for alignment corrections will be determined.


相关文章:
Diagnostics for a 1.2 kA, 1 MeV, Electron Induction Injector_....pdf
3 MeV, and 2-microsecond pulse parameters of ...Planned diagnostics include an isolated cathode with...(DARHT) Facility, under construction at the Los...
双脉冲电子束源实验研究.pdf
DARHT2 Ⅱ 装置采用的是长脉冲电子束源 ,加速后...(a) , cathode’ double s voltage (b ,ch2) ... 3 讨论与结论 实验研究表明 ,利用现有 2MeV ...
Simulations of the BNLSLACUCLA 1.6 Cell Emittance Compensated....pdf
A dedicated low energy (2 to 10 MeV) ...Total Charge Number of particles Cathode Spot Size...3. Low Energy Beam Line Design the kicker ...
MOP01G.pdf
cathode lifetime, a 50 l/s ion pump keeps ...2.3 Klystron and modulator They are two klystron...MeV electron beam, reasonnably good for the ...
Pulsed Neutron Source using 100-MeV electron Linac at Pohang ....pdf
with a tungsten dispenser cathode of 6 mm ...We designed a 100-MeV electron linac [3] and ...construction and operation of the 2-GeV linac at...
DETAILS OF THE INITIAL PART OF THE TUNGSTEN ION LINAC FOR ....pdf
nal energy of 1.7 MeV/amu. The intermediate ... of the source design is shown in Figure 2. ...The cathode block construction gives a possibility ...
Reliability History and Improvements to the ANL 50 MEV H- ....pdf
Improvements to the ANL 50 MEV H- Accelerator_...Cathodes degrade gradually, giving several months ...However, on the occasional two-to-three week ...
A High Duty Factor Electron Linac for FEL_图文.pdf
Figure 3. This photograph is taken from the 18 MeV end of the ... Cathode Gradient: 26 MV/meter Number of cells: 2 RF Frequency: 433 x10...
Liu2_图文.pdf
Design on the 5 MeV Injector 3D simple RF model Code Frequency Q0 (MHz) Superfish(1) MWS-simple(2) MWS- complicated(3) 216.49 216.42 216.64 ...
2MeV注入器绝缘支撑设计与实验_图文.pdf
2MeV注入器绝缘支撑设计与实验_专业资料。针对更高...3 . M ay, 2002 文章编号: 100124322 ( 2002) ...cathode edge 图 8 磁场对阴极边沿发射的杂散电子...
l3_scpowersys_dm_done2_图文.pdf
+ H Y D R O G E N 2e2H+ Cathode Anode ... 1 Mev electrons/cm2 Alternate Solar Cell ...(3 cells) 40 50 V Solar Array Construction ...
模拟低频反馈系统的初步尝试.pdf
DARHT2 Ⅱ 装置采用的是长脉冲电子束源 ,加速后...(a) , cathode’ double s voltage (b ,ch2) ...Design and performance of the 1. 5MeV Injector ...
12 MeV直线感应加速器主开关的优化设计.pdf
2 优化主开关局部结构图 3 优化前后的参数比较...( ICPPS)for DARHT A] 10th IEEE International ...design of the main switch( using in 12MeV ...
the construction of th....pdf
The Construction of the BESIII Experiment_专业资料...Central-of-Mass energy (MeV) 3097 3670 3686 ...2. 3. 4. 5. 6. 7. BESIII design report, ...
...AT VISIBLE AND IR RANGE OF LINAC-BASED FELs AT THE FELI_....pdf
MeV and 80-MeV undulator beam SWB is designed ...(2.5%) for a 2MW and 0.3MW, and FEL ...The gun with a dispenser cathode (EIMAC Y646B...
BEAM TEST OF THERMIONIC CATHODE X-BAND RF-GUN AND LINAC FOR ....pdf
cathode 3.5 cell X-band RF-gun, 2.0 MeV ...2 is under construction. The X-ray yield by ...The RF design of an HO... 3页 免费 ...
performance of the light....pdf
design for MeV gamma-ray astrophysics, following ...2, where the cathode plate has been removed to...view the assembly of grid,X-Y wires and anodes...
development of an x-band....pdf
MeV, 0.5nC, sub-picosecond electron bunches ...design and construction of the main components of...HFSS[2] and MAFIA[3] were used to design the...
the rf design of an hom ....pdf
Cathode RF STRUCTURE DESIGN AND OPTIMIZATION The ...used for the simulation is shown in Figure 3. ...(0.6%) at <E>=20.2 MeV and σt=2.1 ...
the fabre project at tri....pdf
iv) capability to host a photo-cathode in ...2 and 3. T_[MeV] 1200 1000 800 T [MeV] ... design and construction of an integrated photo-...