Finite Element Analysis of Mooring Cable


International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 Trends and Recent Advances in Civil Engineering (TRACE- 24th-25th January 2014) RESEARCH ARTICLE OPEN ACCESS

Finite Element Analysis of Mooring Cable
Vineesh.M.V*, Nithin V Sabu**, Manju.P.M***
*PG Student, Email: vineesh.vineesh.mv@gmail.com **Assistant Professor, Email: nithinengg@gmail.com. ***Associate Professor, Email: mpm_799@yahoo.com. Department of Civil Engineering, Sree Narayana Gurukulam College of Engineering, Kerala, India

ABSTRACT
The Mooring refers to the means for providing the connection between the structure and the seafloor. It is used for securing the structure against the environmental forces. Moorings typically have three basic components anchor, chain or cable and floating devices. The mooring system relies on the strength of the anchors, digging depth and the soil properties. The mooring lines run from the structures to the anchors on the seafloor these are made up of synthetic fiber rope, wire and chain or a combination of these. The catenary mooring system is the most commonly used system and at the seabed, the mooring cable lies horizontally. The rope comes in at 30- 45 degree angle with the seabed. The different forces are acting on the mooring cable under tidal and climatic conditions such as current force, wave force and wind force. In this analysis studied the behaviour of mooring cable attached to buoy and spar platform under environmental forces using FEA package ANSYS 10.0. The application of CFRP material as a mooring cable instead of existing steel and fibre rope mooring cables is studied. Keywords – Buoy, Offshore, Spar, Vessels, Wave. cable, drag forces due to current and wind, line tension due to wave load and shock/snatch. In this I. Introduction A Mooring refers to any permanent offshore study spherical buoy and spar platform moored using structure to which a vessel or platform may be mooring cable are considered. The cable anchored at secured. Moorings typically have three basic the sea bed. components an anchor, chain or line and flotation When the floating bodies experiences the different devices. The mooring cables run from the vessel to motions under environmental forces such as surge, the anchors on the sea floor. The rope comes in at a heave and sway (i.e. translation in x, y and z axis), 30-45 degree angle with the seabed. The mooring roll, yaw and pitch (i.e. rotations in x, y and z axis). system relies on the strength of the anchors, digging The main objective of this study is to find the depth and the soil properties. The forces acting on the behaviour of the mooring cable under environmental mooring cables are gravity force, drag force and wave force. The numerical investigation of behaviour of force. Environmental factors wind, waves and mooring cable is found out by using ANSYS 10.0. currents determine which materials make up the II. Mooring Cable mooring system. A mooring line or cable is a thick rope or D.T. Brown and S. Mavrakos [4] presented a comparative study on the dynamic analysis of cable which is used to anchor a structure in place. A suspended wire and chain mooring lines. M.A Vaz typical mooring system is shown in Fig: 1. completely submerged mooring line and M.H. Patel [5] formulated the governing The equations to analyze the three-dimensional behaviour configuration is considered as a catenary curve. The of segmented elastic mooring line catenaries. Jason I co-ordinate for the catenary curve has been found out and Mark A [7] presented an empirical model for the using the standard mathematical equations and dynamic tension due to vertical motions at the top of a calculations. The co-ordinates of catenary is given by catenary mooring. YU Long and TAN Jia-hua [11] the equation (1) studied about mooring cable using two-dimensional y= a cosh (x/a) finite element model for different water depths. Iordan The length of mooring cable is given by the equation (2) C [13] studied about the static configuration of S = a sinh (x/a) mooring cable using new mathematical model and where y=vertical co-ordinate; S= length of mooring cable; x=horizontal co-ordinate in reference to the numerical method based on finite differences. This paper illustrates the behaviour of mooring cable lowest point; a=height of the lowest point on the chain under the environmental forces. The forces acting on from the horizontal reference line. mooring cable is self weight due to the weight of

Sree Narayana Gurukulam College of Engineering

13 | P a g e

International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 Trends and Recent Advances in Civil Engineering (TRACE- 24th-25th January 2014) IV. Spar Platform

For the present study a typical offshore structure Classic Spar is identified. One end of the mooring cable is attached to the Spar with the other end is attached to the seabed. For the study consider the spar located in Malaysian sea. Table 3 shows the details of the environmental data in Malaysian sea. Table 3 Environmental data in Malaysian sea [15] Data Water depth (h) 1018 m Current speed (v) 0.50 m/s Significant wave height(H) 6.00 m Time period (T) 14.00 s For this study 4 numbers of 200 mm diameter mooring cables is used for anchoring the spar platform. The wave and current forces are considered for this study. The wave force is calculated by using Froude-Krylov Theory. The wave force on cylindrical structure is given by the equations (FWa) = CH ρV2J1 (ka) sinh(kl/2) ?0 ka (kl/2) (4)

Fig.1 Typical mooring system [12] For this study select the buoy and spar platform anchored by using mooring cable. Its response is calculated by using different mooring cable materials and combinations. The environmental conditions and cable properties are identified for this study.

III.

Buoy

From the different buoys available a typical spherical buoy is considered for present the study. One end of the mooring cable is attached to the buoy and other end is attached to the seabed. For the study consider the buoy is anchored at Arabian sea. Table 1 shows the details of the environmental data in Arabian sea. Table 1 Environmental data in Arabian sea Data Water depth (h) Current speed (v) 52.00 m 1.02 m/s

where FWa=horizontal wave force; ρ=density of sea water; CH =horizontal force coefficient; V=submerged volume of the structure; ka=diffraction parameter; k=wave number; l=submerged depth; ?0=horizontal acceleration. Table 4 shows the details of dimensions of spar platform Table 4 Dimensions of spar structure [15] Dimensions Length 213.04 m Diameter 40.54 m Draft 198.12 m Table 5 shows the details of the catenary mooring cable co-ordinates for spar structure. Table 5 Co-ordinates of mooring cable for spar structure X Co-ordinates Y Co-ordinates 00.00 00.00 50.00 05.08 100.0 20.52 150.0 46.95 200.0 85.47 250.0 137.6

The mooring cable diameter is taken as 250 mm and buoy diameter is 1.84 m. Current force acting on the mooring cable is considered for this study and it is calculated by the equation FC = 1/2 ρ Cd D v? (3) where FC=current force; ρ=density of sea water; Cd =drag coefficient; D=diameter of mooring cable; v=current speed. Table 2 Co-ordinates of mooring cable for buoy X Co-ordinates Y Co-ordinates 00.00 00.00 05.00 01.28 10.00 05.43 15.00 13.52 16.50 16.99 20.00 27.61 22.50 37.95 25.00 52.00

Sree Narayana Gurukulam College of Engineering

14 | P a g e

International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 Trends and Recent Advances in Civil Engineering (TRACE- 24th-25th January 2014)
300.0 350.0 400.0 450.0 500.0 550.0 205.6 292.8 401.0 536.4 704.1 911.5 Wind force on hull of barge (F Wi) = 1/2 ρ1 Cd A v? = 3193.3 N

VII.

Finite Element Analysis

In ANSYS 10.0 the following elements plastic23, plane42, shell63 are used for the analysis.

7.1 Mooring Cable Attached to Buoy V. Vessel
Floating bodies such as oil tanker is considered in the present analysis. The floating body is treated as a plane element. For this analysis consider the homogeneous mooring cable is connected to the stern and bow side of the tanker. The vessel is modelled as Plane42 element. For the study consider the tanker is berthed at Cochin port. The loads on the vessels and mooring cable are studied and apply the loads on the structures. Table 6 shows the details of the environmental data in Cochin port. Table 6 Environmental data in Malaysian sea Data Water depth (h) Current speed (v) Wind speed 14 m 1.029m/s 3.00 m/s Some of the assumptions are made for the finite element analysis of buoy. ? Mooring cable does not stretch under tension. i.e. elongation will be neglected. ? Current direction has only horizontal component. ? Current is in contact along the mooring cable length. ? Mooring cables are flexible. Boundary Conditions: The one end of the mooring cable is attached to the seabed (i.e. all translations and rotations are arrested). And the other end is attached to buoy. Mooring Cable Materials for Analysis ? Steel Chain ? Synthetic Fibre Rope ? Carbon Fibre Reinforced Plastic (CFRP) ? Steel Chain + Fibre Rope (50% of total mooring cable length) ? Steel Chain + CFRP (50% of total mooring cable length) The buoy along with the catenary mooring is analyzed for the loads acting on the mooring line and the buoy. The Fig. 1 and Fig. 2 show the modeling and displacement diagram of steel chain mooring cable attached to buoy.

VI. Load Calculation 6.1 Forces Acting on Mooring Cable for Buoy
Current Force on Mooring Cable: Drag coefficient (Cd) = 1.8 Density of water (ρ) = 1025 kg/m? Current force (FC) = 1/2 ρ Cd D v? = 243.72 N/m

6.2 Forces Acting on Mooring Cable for Spar Platform
Current Force on Mooring Cable: Drag coefficient = 1.8 Current force (FC) = 1/2 ρ Cd D v? = 46.12 N/m Current Force on Spar Platform: Drag coefficient (Cd) = 1.8 Density of water (ρ) = 1025 kg/m? Current force (FC) = 1/2 ρ Cd D v? = 9.35×103 N/m Wave Force on Spar Platform: Froude-Krylov Theory Horizontal wave force (FWa) = CH ρV2J1 (ka) sinh(kl/2) ?0 ka (kl/2) = 7187×103 N

Fig. 2 Load and boundary conditions applied to the mooring cable with buoy

6.3 Forces Acting on Vessel
Current Force: Drag coefficient (Cd) Current force on barge (FC) = 0.8 = 1/2 ρ Cd A v? = 13127.9 N

Wind force: Drag coefficient (Cd) = 0.8 Wind force on deck of barge (FWi) = 1/2 ρ1 Cd A v? = 6386.6 N

Sree Narayana Gurukulam College of Engineering

15 | P a g e

International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 Trends and Recent Advances in Civil Engineering (TRACE- 24th-25th January 2014)

Fig. 3 Maximum horizontal displacement of the Buoy

7.1.1 Results and Discussion
Table 7 Maximum horizontal displacement and stress Mooring cable Max. buoy Max. stress materials displacement (N/m2) (m) Steel chain 2.39 0.2×108 Synthetic 4.49 0.2×108 fibre 2.24 0.2×108 CFRP Steel chain + 3.44 0.2×108 Synthetic fibre 3.17 0.2×108 Steel chain + CFRP Linear static analysis mooring cable was carried out for three different mooring cables and its combinations with spherical buoy. The horizontal displacement of buoy under the force is reduced by using CFRP material. The analysis shows that the use of CFRP material can reduce the displacement of buoy.

Fig. 4 Load and boundary conditions applied to spar platform

Fig. 5 Maximum horizontal displacement of the Buoy

7.2.1 Results and Discussion
Table 8 Maximum displacement of spar platform Mooring cable Max. displacement (m) materials Horizontal Vertical Steel chain + 20.30 3.40 Synthetic fibre Steel chain + CFRP 15.67 2.24 Linear static analysis mooring cable was carried out for different mooring cable combinations with spar platform. The displacements of spar under the forces are reduced by using CFRP material.

7.2 Mooring Cable Attached to Spar Platform
For the present study a typical offshore structure Classic Spar is identified. The Spar is modelled as shell63 element and mooring cable is modelled as plastic23 element. The loads on the Spar and mooring cable are studied and apply the loads on the structure. For this study mooring cable of different material such as combinations of steel chain and synthetic fibre, steel chain and CFRP is considered. Boundary Conditions: One end of the mooring cable is attached to the Spar with the other end is attached to the seabed. Mooring cable materials for analysis ? Steel chain + Synthetic Fibre ? Steel chain + CFRP The Fig. 4 and Fig. 5 show the modeling and displacement diagram of combination of steel chain and synthetic fibre mooring cable attached to spar platform.

7.3 Calculation of Number of Mooring Cables for Spar Platform
For the present study a typical offshore structure Classic Spar is selected. One end of the spring element (i.e.combin14) is attached to the spar cylinder and other end is taken 1 m from the cylinder and treated as fixed. The forces calculated are applied to the structure and the response is found out. The analysis is repeated to find a suitable stiffness value such that the displacement element comes down to 16 | P a g e

Sree Narayana Gurukulam College of Engineering

International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 Trends and Recent Advances in Civil Engineering (TRACE- 24th-25th January 2014)
zero. So for the same stiffness the number of mooring cable attached can be found out by dividing the stiffness value of each mooring cable. The Fig. 6 and Fig. 7 show the modeling and displacement diagram of spar platform connected to spring element. CFRP Mooring Cable Diameter of mooring cable = 230 mm Stiffness mooring cable = EA/L = 9.97×109 N/m Number of mooring cable = 5.42×1010/4.65×109 = 6 From the analysis 6 numbers of 230 mm diameter fibre rope mooring cables is required for spar structure mooring system. From this analysis found that number of mooring cables could minimize by using the CFRP material.

7.4 Mooring Cable Attached to Vessel
Floating bodies such as oil tanker is considered in the present analysis. For this analysis consider the homogeneous mooring cables are connected to the tanker. The tanker is berthed at the port. Boundary Conditions: One end of the spring element (i.e.combin14) is attached to the vessels deck and other end is taken 1 m from the deck and treated as fixed. The forces calculated is applied to the structure and the response is found out.

Fig. 6 Load and boundary conditions applied to spar platform Connected to spring element

Fig. 7 Maximum displacement of the spar platform

7.3.1 Results and Discussion
Table 9 Max. displacement and stiffness of spar platform Structure Max. Stiffness displacement (N/m) (m) Spar platform 0.16 5.42×1010 Total stiffness required = 5.42×1010 N/m Fibre Rope Mooring Cable Diameter of mooring cable = 230 mm Stiffness mooring cable = EA/L = 4.65×109 N/m Number of mooring cable = 5.42×1010/4.65×109 = 12 From the analysis 12 numbers of 230 mm diameter fibre rope mooring cables is required for spar structure mooring system.

Fig. 8 Load and boundary conditions applied to tanker

Fig. 9 Maximum displacement of the tanker 17 | P a g e

Sree Narayana Gurukulam College of Engineering

International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 Trends and Recent Advances in Civil Engineering (TRACE- 24th-25th January 2014) 7.4.1 Results and Discussion
Table 10 Max. displacement and stiffness of tanker Structure Max. Stiffness displacement (N/m) (m) Tanker 0.0003 4.45×109 [2] [3] S.A.Mavrakos et al, 1996, Deep water mooring dynamics. Marine Structures. Vol.9, PP. 181-209. Yungang Liu and Lars Bergdahl, 1998, Extreme mooring cable tensions due to wavefrequency excitations. Applied Ocean Research. Vol.20, PP. 237-249. D.T. Brown, S. Mavrakos, 1999, Comparative study on mooring line dynamic loading. Marine Structures. Vol.12, 131-151. M.A Vaz and M.H Patel, 2000, Threedimentional behaviour of elastic marine cables in sheared currents, Applied Ocean Research, Vol.22, 45-53. Russell J. Smith and Colin J. MacFarlane, 2001, Statics of a three component mooring line. Ocean Engineering. Vol.28, 899-914. Jason I.Gobat and Mark A. Grosenbaugh, 2001, A simple model for heave induced dynamic tension in catenary moorings. Applied Ocean Research. Vol.23, 159-174. A.Sarkar and R.E.Taylor, 2002, Dynamics of mooring cables in random seas. Journal of Fluids and Structures. Vol.16, PP. 193-212. Y.T. Chai et al, 2002, Semi-analytical quasistatic formulation for three-dimensional partially grounded mooring system problems, Ocean Engineering, Vol.29, 627-649. A.Sarkar and R.E.Taylor, 2002, Dynamics of mooring cables in random seas. Journal of Fluids and Structures. Vol.16, PP. 193-212. YU Long and TAN Jia-hua, 2006, Numerical investigation of seabed interaction in time domain analysis of mooring cables. Journal of Hydrodynamics. Vol.18, 424-430. J.I. Gobat and M.A. Grosenbaugh, 2006, Time-domain numerical simulation of ocean cable structures. Ocean Engineering. Vol.33, 1373-1400. Iordan C. Matulea, Alexandrau Nastase, Nicoleta, Georgica Slamnoiu and A.M. Goncalves-Coelho, 2008, On the equilibrium configuration of mooring and towing cables. Applied Ocean Research. Vol.30, 81-91. Li-Zhong Wang et al, 2010, Threedimensional interaction between anchor chain and seabed. Applied Ocean Research. Vol.32, 404-413. A. B. M. Saiful Islam et al, 2011, Spar platform at deep water region in Malaysian sea. International Journal of the Physical Sciences. Vol.6, PP. 6872-6881. Hamid Sarlak, 2010, Experimental investigation of offshore wave buoy performance. Journal of Marine Engineering. Vol.6, PP. 1E-11E.

[4] [5]

Total stiffness required = 4.45×109 N/m Fibre Rope Mooring Cable: Diameter of fibre rope mooring cable = 80 mm Stiffness fibre rope mooring cable = EA/L = 5.62×108 N/m Number of mooring cable = 4.45×109/5.62×108 = 8 Nos From the analysis 8 numbers of 80 mm diameter fibre rope mooring cable is required for berthing of tanker. CFRP Mooring Cable: Diameter of CFRP mooring cable = 80 mm Stiffness CFRP mooring cable = EA/L = 1.20×109 N/m Number of mooring cable = 4.45×109/1.20×109 = 4 Nos From the analysis 4 numbers of 80 mm diameter CFRP mooring cable is required for berthing of barge.

[6] [7]

[8] [9]

VIII.

Conclusions

The study was focused on mooring cable, which is widely used in the marine and offshore industry. The two structures where mooring cable used are selected (i.e. buoys and offshore structures). A typical analysis was carried out on a floating buoy using FEA software ANSYS. The loadings on the buoy were calculated and their effect on the structure was found out for different materials and different combinations of mooring cable. From the analysis found that CFRP mooring cable is more effective for reducing the displacement of buoy than other steel chain and synthetic fibre mooring cable. A spar structure and oil tanker were taken for the study and response of spar structure was found out by using different mooring materials. In deep water, combination of steel chain and CFRP mooring cable is effectively reducing the response of the structure than the steel chain and synthetic fibre combinations. The required stiffness of altogether for the spar is found out using FEA. The structure mainly experience heave motion, to reduce these motions the required numbers of mooring cable and its dimensions were found subsequently.

[10] [11]

[12]

[13]

[14]

[15]

References
[1] R.Natarajan and C.Ganapathy, 1995, Analysis of mooring of a berthed ship. Marine Structures. Vol.8, 481-499.

[16]

Sree Narayana Gurukulam College of Engineering

18 | P a g e


相关文章:
船舶英语缩写
single point mooring 单点系 泊 DRP: drilling ... subsea cable 海底电缆 DIA: diameter 直径 S/F:...(Finite Element Method)有限元法 FPSO (Floating ...
AQWA
mooring analysis of single or coupled floating ... polynomial description of steel-wire cables up ...incorporate FEMGV, a finite element model ...
ABS-rule list
(INCLUDES COMMENTARY) GUIDANCE NOTES ON NONLINEAR FINITE ELEMENT ANALYSIS OF ...MOORING CHAIN RULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON ...
PL19-3 SYMS组块运输载荷工况下结构强度有限元分析
The finite element structure strength analysis for PL19-3 SYMS(Soft Yoke Mooring System) topside under transportation loads case can be analyzed by ANSYS...
船舶动力主要专业英汉词汇
chain cable compressor 制链器 84、mooring bitt 带缆桩 85、mooring cleat ...finite element 有限元 fire tube boiler 水火管锅炉 fixed-pitch 固定螺距式 ...
船舶设备英语缩写
Cable Trunk Class Comment Item Cargo Control Room...54) 61 62 63 FEM FEU FOC Finite Element ... Convention Specification Single Point Mooring 详细...
7#锚链转盘设计
强度校核 II Abstract Anchor chain turntable of the mooring chain is serves ...finite element analysis, to presses the files machine structure to carry on...
...Procedures for Plane Beam Element of Large Rotat...
Many studies have been carried out for the analysis of high tension cable problems using the classic cable theory and the finite element method. However,...
广东佛山世纪莲花体育场屋盖索网结构施工仿真分析
关键词:施工仿真;索网结构;整体提升;初始缺陷长度 Finite Element Analysis of Construction Process of the Cable-net Roof Structu Abstract:This paper simulates...
FEA for substructure of main towing bollard
The purpose of the finite element analysis for substructure of main towing ...The mesh size in way of mooring foundation including reinforced hull ...
更多相关标签: