当前位置:首页 >> >>

Inspection report


Quality Inspection Report
【】 1st inspection P.O. No. Client name Item No. Description: Order Qty: Packed Qty: 【】 2nd inspection

(Final inspection)

Date:

【】 3rd inspection

Tracker: Factory/Vendor/Address:

INSPECTION METHOD: visual inspection of the goods and workmanship according to the approval sample or specifications in the purchase order.

Sampling plan: MIL-STD-105E ( NORMAL INSPECTION, SINGLE SAMPLING ) INSPECTION LEVEL: GENERAL INSPECTION LEVEL - II

Package 1.Master carton Markings 2.Inner carton markings 3.Country of origin 4.Specail requirement on CTN 5.Master CTN Qty 6.Inner CTN Qty 7.Barcode / Upc / Other label 8. hearder card 9.Poly bag / warnings 10. instruction sheet Packing: Inner packing:

Function / Material 1. Appearance 2. Color 3. Shape and dimension of product 4. Assembly test 5. Material 6. Accessories 7. Compare with file / approved samples / photo 8. Test as user manual / MI 9. Function performance 10.Other pcs/Poly bag, pcs/Inner box,

Other 1. Sharp point / edge 2. Safety pull / push test 3. Humidity test 4. Fastness test 5. Lab test/Brine test 6. outdoor test 7. Dishwasher test 8.Latitude and longitude test 9. Salt spray test 10.CTNsize: × × cm/inch.NW Master packing: GW:

pcs/Master carton.

If special packing, please specify:

Drop test:
【】Master CTN

cm/inch
Drop test CTN

sides

edges
Test Qty

corner

【】N/A:
Pass Reject

Broken Qty

【】Individual CTN

ACCEPTABLE QUALITY LEVEL (AQL) FOR:

Function (S-

)

; Major / Cri Fun

; Minor_________. /__________(pcs/sets) Maj Min

Sample Size:_______(pcs/sets) Allowed for Fun/Major/Minor defects: Details of Defectives

Total Defect Found: 【】Approved Sample 【】 【】Photo 【】 【】No 【】 approved sample 【】No 【】 photo

Remark:

INSPECTION RESULTS: Inspector:

ACCEPT Vendor signature:

REJECT Approved by:

(We inspect products randomly.If customer complaint or charge back the poor quality which occurred by transportation,chemistry,packing method or other factor.The vendor must compensate the feight, tariff, advertisement fee and other relevant termlessly without any counter action, though it have passed our inspection.) Evergreen Enterprises,Inc, NB Office .218#, Huangshan West Road,BeilunDistrict,Ningbo,China .TEL: 0574-26882302/2325.Fax:0574-26882222


相关文章:
site-inspection-report 现场检验报告 英文版
Version 2.1, February 2012 Site inspection report The site inspection focuses on the implementation of risk controls used by contractors following the work ...
Sample Inspection Report
(Shanghai) Co.,Ltd XXX Shanghai, Zip: Tel:0086-21- XXX 国际贸易(上海)有限公司 上海市 XXXX 邮编: 网址: Fax:0086-21- Sample Inspection Report ...
Final Inspection Report_图文
Final Inspection Report - Client: Inspection #: Report Date: Page: Tradeka Page 1 of 4 FINAL IN...
EA Inspection Report HZ 2013最新_图文
EA Inspection Report HZ 2013最新 - EA LIVING LIMITED (HONG KONG) INSPECTION REPORT Page / ATTN: PAR...
彩宝检验报告 INSPECTION REPORT(中英文对照)
彩宝检验报告 INSPECTION REPORT(中英文对照) - 检验报告:Inspection Report 送样名称:Sample 规格型号:Product Model 委托人:Consi...
shipment inspection report_图文
shipment inspection report - T-Opto Report to: Report by: Project: Shipping time: Supplier: ? S...
self-inspection report 空白
self-inspection report 空白_制度/规范_工作范文_实用文档。礼品自检手册 William E. Connor (Taiwan) Ltd. 供应商自检报告 – DEVELOPMENT SAMPLE 验货日期: 供应...
Daily Inspection Report Form (2010 05 14)
Daily Inspection Report Form (2010 05 14)_英语学习_外语学习_教育专区。Inspection Report Surface and Ambient Condition PROJECT : BHEL ITEM : 9F Pulse ...
2007-7-26Pre-Shipment Inspection Report Format
EAGLETON INTERNAL PRODUCT INSPECTION REPORT (1.33) REQUIREMENTS 鹰高顿内部验货报告(1.33)填写规范 PART A: GENERAL INFORMATION (产品资料) 填写事项 Inspection ...
QUALITY INSPECTION REPORT --- DHR-20A Dehydrator_图文
QUALITY INSPECTION REPORT --- DHR-20A Dehydrator_生产/经营管理_经管营销_专业资料。CONTINENTAL CONAIR LIMITED FORM NO.: DHR20A-QI-01-1 1 / 3 page ...
更多相关标签: