当前位置:首页 >> >>

Inspection report


Quality Inspection Report
【】 1st inspection P.O. No. Client name Item No. Description: Order Qty: Packed Qty: 【】 2nd inspection

(Final inspection)

Date:

【】 3rd inspection

Tracker: Factory/Vendor/Address:

INSPECTION METHOD: visual inspection of the goods and workmanship according to the approval sample or specifications in the purchase order.

Sampling plan: MIL-STD-105E ( NORMAL INSPECTION, SINGLE SAMPLING ) INSPECTION LEVEL: GENERAL INSPECTION LEVEL - II

Package 1.Master carton Markings 2.Inner carton markings 3.Country of origin 4.Specail requirement on CTN 5.Master CTN Qty 6.Inner CTN Qty 7.Barcode / Upc / Other label 8. hearder card 9.Poly bag / warnings 10. instruction sheet Packing: Inner packing:

Function / Material 1. Appearance 2. Color 3. Shape and dimension of product 4. Assembly test 5. Material 6. Accessories 7. Compare with file / approved samples / photo 8. Test as user manual / MI 9. Function performance 10.Other pcs/Poly bag, pcs/Inner box,

Other 1. Sharp point / edge 2. Safety pull / push test 3. Humidity test 4. Fastness test 5. Lab test/Brine test 6. outdoor test 7. Dishwasher test 8.Latitude and longitude test 9. Salt spray test 10.CTNsize: × × cm/inch.NW Master packing: GW:

pcs/Master carton.

If special packing, please specify:

Drop test:
【】Master CTN

cm/inch
Drop test CTN

sides

edges
Test Qty

corner

【】N/A:
Pass Reject

Broken Qty

【】Individual CTN

ACCEPTABLE QUALITY LEVEL (AQL) FOR:

Function (S-

)

; Major / Cri Fun

; Minor_________. /__________(pcs/sets) Maj Min

Sample Size:_______(pcs/sets) Allowed for Fun/Major/Minor defects: Details of Defectives

Total Defect Found: 【】Approved Sample 【】 【】Photo 【】 【】No 【】 approved sample 【】No 【】 photo

Remark:

INSPECTION RESULTS: Inspector:

ACCEPT Vendor signature:

REJECT Approved by:

(We inspect products randomly.If customer complaint or charge back the poor quality which occurred by transportation,chemistry,packing method or other factor.The vendor must compensate the feight, tariff, advertisement fee and other relevant termlessly without any counter action, though it have passed our inspection.) Evergreen Enterprises,Inc, NB Office .218#, Huangshan West Road,BeilunDistrict,Ningbo,China .TEL: 0574-26882302/2325.Fax:0574-26882222


赞助商链接
相关文章:
Inspection report
Inspection report_英语学习_外语学习_教育专区。自主檢查 SHOP INSPECTION PROCEDURE QP02002A-1 合約編號 Contract No. 專案名稱 Project Name 業主 Client 專案...
SIP for Inspection (EN)
If necessary, supplier should submit inspection report from third party. D、对于有表面处理要求的,需要求供应商按照要求提供表面处理检测合格报告; As for ...
Inspection and test plan 完整版 (详细版)
Each assembly piece 检验表单 Inspection report 设计图纸 design drawing 质控部/结构检验员 QC/structural inspector 外形检查 Configuration inspection 产生的变形。 ...
EA Inspection Report HZ 2013最新
EA Inspection Report HZ 2013最新_法律资料_人文社科_专业资料 暂无评价|0人阅读|0次下载|举报文档 EA Inspection Report HZ 2013最新_法律资料_人文社科_专业...
15071140-1 NJ新奥,宁港驳3000-3 Inspection report
15071140-1 NJ新奥,宁港驳3000-3 Inspection report_环境科学/食品科学_工程科技_专业资料。赚点经验煤 炭检 验报告 工作单号 申请方 报验船名 据称货物 ...
成品检验报告
成品检验报告 - 成品检验报告 Finished Product Inspection Report 产品名称 Part Name 产品代号 Code YG 订单编号 YG PO No 表面处理...
D'Rapport Weekly SHE Inspection Report No. 46 2016-...
D'Rapport Weekly SHE Inspection Report No. 46 2016-05-24-Ver2_建筑/土木_工程科技_专业资料。马来西亚安全检查 D’Rapport Weekly SHE Inspection Report ...
3W SELF-INSPECTION REPORT
3W SELF-INSPECTION REPORT_电脑基础知识_IT/计算机_专业资料。成品自检报告 SELF-INSPECTION REPORT Buyer : Agent : Supplier : Manufacturer : P.O. Number: ...
FINAL INSPECTION REPORT
FINAL INSPECTION REPORT_计算机软件及应用_IT/计算机_专业资料 暂无评价|0人阅读|0次下载|举报文档 FINAL INSPECTION REPORT_计算机软件及应用_IT/计算机_专业资料。...
Pre-Opening Inspection Report - 35 pages - 03-21-00
Pre-Opening Inspection Report - 35 pages - 03-21-00_英语学习_外语学习_教育专区 暂无评价|0人阅读|0次下载|举报文档 Pre-Opening Inspection Report - 35 ...
更多相关标签: