当前位置:首页 >> 机械/仪表 >>

HP04 Final Inspection Procedure


LINMARK
HARDGOODS QUALITY ASSURANCE PROCEDURE

HP-04

Revision A 18-Jun-2001

Final Inspection Procedure

Reference Number HP-04

Final Inspection Procedure 1 Scope

HP-04

This procedure specifies the requirements for performing final inspection when the merchandise is ready for inspection. This apply to all kinds of merchandise require inspection before releasing for shipment to customer. Inspectors are required to follow this procedure in order to maintain the inspection practice to a professional standard.

2

Reference

Refer to a) Sampling & Inspection by Attribute Method ANSI/ASQC Z1.4-1993 (formerly known as MIL Std ABC-STD 105E) for selecting inspection sampling plan. b) Relevant inspection protocol of individual categories product for specific inspection requirements.

3

Preparation for Inspection

Inspector should have the following documents/Information and have reviewed them before starting inspection. a. Inspection Booking Form b. Customer Purchase Order c. Linmark Order Confirmation d. Product Specification e. Product Photo f. Approval Sample (with full packaging) g. Testing Approval Record

4

Identify merchandise

Identify the merchandise for final inspection and check if it is ready for inspection. This includes the correct merchandise with right style, right quantity, at the right place for inspection.

Linmark Hardgoods Quality Assurance Procedure

Page 1 of 4

Final Inspection Procedure

HP-04

When the merchandise is said to be ready for inspection, the merchandise must have been 100% produced and at least 80% packed in export carton.

5

Sampling Plan

Refer to Sampling & Inspection by Attribute Method ANSI/ASQC Z1.41993 for sample plan. Unless otherwise specified, general sampling plan standard is Inspection level II Critical Defect: accept zero defect Major Defect: AQL 2.5 Minor Defect: AQL 4.0

6

Types of Defects

Critical defect is the defect that would probably cause injure/unsafe to customer during use or abuse. Typical examples are sharp point/edge on toys, current leakage on electrical items. Major defect is the defect that would affect the function or perceived value of the merchandise. Having the major defects, customers are most likely not willing to buy the merchandise. Minor defect is the imperfection on the merchandise that would not affect the function or perceived value of the merchandise.

7

Carton Packing and Labeling

Refer to Customer Purchase Order/Linmark Order Confirmation for carton packing and labeling requirements.

8

Product Packing and Labeling

Refer to Customer Purchase Order/Linmark Order Confirmation for product packing and labeling requirements.

9

Carton Drop Test

Perform carton drop for export carton or mailing order box. The export carton must properly protect the merchandises. The number of
Linmark Hardgoods Quality Assurance Procedure Page 2 of 4

Final Inspection Procedure

HP-04

detectives must not exceeds the percentage of allowance specified Customer Purchase Order/Linmark Order Confirmation. Fragile products are exempt from carton drop test. These cartons must be labeled ‘Fragile’ to alert for proper handling.

10

Product Drop Test

Product drop test is required for toys product and products otherwise specified. Refer to toys product drop test method for testing method.

11

Visual Inspection

Visually inspect the merchandise at distance of 18” under normal lighting. Identify defectives, label and separate defectives from the bulk for review before concluding the inspection results.

12

Function Test

Perform functional testing according to the relevant product category requirements.

13

Review of finding

After finished inspection, review the defectives and findings. Check against inspection documents/information for completeness and correctness of inspection details. This process may be performed together with vendor/factory’s representative.

14

Writing Inspection Report

Document the inspection results in the inspection report. Detail the findings. Describes the type, extent, location of defects. Review and sign the written report.

15

Reporting Inspection Result

Inspectors are require to inform inspection result to the office requesting the inspection. Inspectors should fax the inspection report followed by a phone call at inspection location to the merchandiser who requesting the inspection.
Linmark Hardgoods Quality Assurance Procedure Page 3 of 4

Final Inspection Procedure 16 Shipment Release

HP-04

After informed the inspection result to the merchandiser, Inspector may release shipment for passed merchandises. No shipment release should be issued for pending/failed inspection.

Linmark Hardgoods Quality Assurance Procedure

Page 4 of 4


赞助商链接
相关文章:
05-Detail Inspection Procedure
2. Scope This procedure is applied for receipt, in-process, and final inspection of all product furnished to a project. 范围 适用于本公司原料及物料进...
HP02 component inspection procedure
HP02 component inspection procedure_信息与通信_工程科技_专业资料。LINMARK HARD...HP04 Final Inspection ... HP05 Factory Evaluatio... 1/2 相关文档推荐 Inc...
进料检验 过程检验 最终检验中英文流程图
Inspection of final products NG OK OK Rec1 procedure of final products ...文档贡献者 jinggangszhu 贡献于2015-04-23 专题推荐 2014教师资格材料分析辅...
中英文最终检验程序文件
Final Inspection Procedure 標題: 产品终检程序 Effective date 文件生效日期:___ Expiry date 文件失效日期:___ DOC No. 文件編號: Pages: Issue 版本:1 FQP...
412 001 FINAL INSPECTION Streamline
412 001 FINAL INSPECTION Streamline_法律资料_人文社科...procedure for vacuum testing of Accudose & ...04 05 Date Nov 1993 Feb 1994 Mar 1996 Feb 1...
ISO9001-2015产品最终检验程序(中英文)
产品最终检验程序 Final Inspection Procedure (ISO9001:2015) 1.0 目的/Purpose: 1.1 确保入仓产品之质量以及送给客户前的产品质量符合客户要求。 To ensure ...
邦泽尔验厂所需文件
Procedure Inspection Standards, Specification(IQC/...Final Inspection Report Outing Inspection Report ...序号 DOCUMENTS 文件 01 02 03 04 05 06 07 08...
QA-08A General Inspection Procedure and Checklist
procedure of pre-shipment when product audit will be conducted at manufacturing location and general requirements for final random inspection to Applica ...
Final Inspection Checklist
Final Inspection Checklist_机械/仪表_工程科技_专业资料。FINAL INSPECTION CHECK...Has inspector monitored welding to procedure i.e. correct pre-heat, ...
FQC产品终检程序(中英文)
德信诚培训网 FQC 产品终检程序 Final Inspection Procedure 文件更改历史记录 Amendment History 版次 更改日期 更改概要 更改人 批准人 Revision Change Date ...
更多相关标签: