Final Inspection Report


Client: Inspection #: Report Date: Page:

Tradeka
Page 1 of 4

FINAL INSPECTION REPORT
Client Contact & Tel Supplier Contact Tel

Tradeka

Factory Contact & Tel Inspectors
Davies

Section1: General Information
Service Performed Buyer P.O.# Final Random Inspection Inspection Place Country of Origin Inspection date

CHINA

Sealed Sample#

Not Available NA NA NA NA NA NA

Check Item
Product Name Item Code# Order Quantities
Lot Size Packed Quantity Sample size/Ctns

Style No.

Pcs

Ctns

Pcs

Ctns

Pcs

Ctns

Pcs

Ctns

Pcs

Ctns

Pcs

Ctns

Product Section2: Product Description Check Item Style No.
Colour Dimension: Material, Components: Label & Other

Material: 1. Plastic: 2. Steel: Material: 1. Plastic: 2. Steel:
NA NA NA NA

1. Age limit: Refer to Fig. 2. Label required: Refer to Fig. 1. Age limit: Refer to Fig. 2. Label required: Refer to Fig. NA

EANSection3: Shipping Mark & EAN-Code & Packing Check Item Style No.
Shipping Mark 1. Main mark: Result: Refer to Fig. 2. Side mark: Result: Refer to Fig. 1. Main mark: Result: Refer to Fig. 2. Side mark: Result: Refer to Fig. EAN-Code 1. Visuall: 2. Scanned: Result: Packing

Measurement

Material & Method&Other

1. Visuall: 2. Scanned: Result:

1set packed inside a retail box together with adorning parts and instruction sheet. 4Pcs packed into a master carton. Printed 7 languages on retail box. With paper board box were used to protect the goods against break.

Client: Inspection #: Report Date: Page:

Tradeka
Page 2 of 4

Mil2859BSSection4: Mil-Std 105E / ISO 2859-1:1999 / BS-6001/ ANSI / ASQC Z1.3
NA
AQL Max Permitted Actual Found Result Cr 0 Maj 1.5 Min 4.0 Cr 0 Maj 1.5 Min 4.0 Cr 0 Maj 1.5 Min 4.0 Cr NA NA Maj NA Min NA Cr NA NA Maj NA Min NA

0 0

0 0

0 0

NA NA

NA NA NA

NA NA

NA NA

NA NA NA

NA NA

Section5 Section5: Workmanship Appearance & Function Findings: Defects Description Item#
1. 2. ---- Fig. ---- Fig.

Total 1. 2. ---- Fig. ---- Fig.

Cr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Major

Minor

Total

Total

Section 6 : Safety & Functional Tests
Note: The following tests were performed on General inspection Level II and special inspection level S-3 during inspection.

Result Test Item
6.1. Carton Drop Test 6.2.Product Drop Test 6.3.Small parts

Sample Size
1Ctns*2

Comments
The carton is dropped on 1base 1edge and 1 face. The drop height is 24in.

6.4. Tension & Torque 6.5.Impact&Compress 6.6. Accessibility check 6.7.Sharp edge &points 6.8.Static strength 6.9.Dynamic strength 6.10. Stability 6.11. Sound levels 6.12. Adhesion test 6.13. Working Check 6.14. Assemble & Disassemble Check

As per EN71-1:05 (Section 8.5) As per EN71-1:05 (Section 8.2) --- The requirement are applicable before and after abuse testing. As per EN71-1:05 (Section 8.3&8.4) As per EN71-1:05 (Section 8.7&8.8) As per EN71-1:05 (Section 8.10) As per EN71-1:05 (Section 8.11&8.12) As per EN71-1:05 (Section 8.21) As per EN71-1:05 (Section 8.22) As per EN71-1:05 (Section 8.23) As per EN71-1:05 (Section 8.28) Recode: LAeq: less than 80dB. 810# Tape As per instruction

As per instruction

Client: Inspection #: Report Date: Page:

Tradeka
Page 3 of 4

Section 7: Remarks (to be confirmed by client)
7.1 7.2 7.3 7.4 7.5 7.6

No approved sample received for inspection reference ---(Advise: Subject to client’s evaluation.)

Status Pending

Inspection Summary
Result Check list
1>Quantity 2> Material, Color &Label etc 3> Packing, Barcode&Mark 4> Appearance & Style 5> Function Check 6> Safety Test
Conformed Conformed Conformed

Pending

Pending

7>Reliability Test 8>Assemble & Disassemble Overall Resurt Due to Section Explanation of Result Due to Section Due Section to

NA NA NA NA NA NA NA NA NA NA NA

NA NA NA NA NA NA NA NA NA NA NA

Picture Information
Fig.1: Main mark Fig.2: Side mark

Fig.3:

Fig.4:

Fig.5: Fig.6: Ean-code Fig.7: Label from Tradeka

Fig.8: Important information from retail & Goods Fig.9: Test Picture

Tension

Strength & loading

Drop

Battery compartment

Adhesion

Defect Picture

Fig.10:

Fig.11:

Fig.12:

Fig.13:

Client: Inspection #: Report Date: Page:

Tradeka
Page 4 of 4

Fig.14:

Fig.15: Nil

Fig.16:

Remarks from the Factory Manager:

Inspector Signature :

Factory Representative Signature :

Buyer signature:


赞助商链接
相关文章:
FINAL INSPECTION REPORT
FINAL INSPECTION REPORT Date of final: Buyer: Buy date: Ship date : Vendor: Collection: Factory: Style: Style name: Location: % Packed: P.O: Ship ...
Final Inspection Report
Client: Inspection #: Report Date: Page: Tradeka Page 1 of 4 FINAL INSPECTION REPORT Client Contact & Tel Supplier Contact Tel Tradeka Factory Contact...
Final Random Inspection Report for DVD Player
Final Random Inspection Report for DVD Player_计算机软件及应用_IT/计算机_专业资料。DVD blank reportFinal Random Inspection Report for DVD Player Inspector ...
...issued by the China Entry―Exit Inspection_答案_百度高考...
“The survey report issued by the China Entry―Exit Inspection and Quarantine Association will be taken as final and binding upon both parties.”最确切的...
final inspection form
12页 5财富值 Final+Inspection+Checkli... 2页 免费 TITLE 5 INSPECTION FORM 暂无评价 9页 免费喜欢此文档的还喜欢 Final inspection report ... 30页 ...
2007-7-26Pre-Shipment Inspection Report Format
2007-7-26Pre-Shipment Inspection Report Format_生产/经营管理_经管营销_专业...一般只会重验二次 在中期 – Inline; 尾期 –Final; ETYT000XXX TRS: ...
Inspection report
Inspection report_专业资料。Quality Inspection Report 【】 1st inspection P....Description: Order Qty: Packed Qty: 【】 2nd inspection (Final inspection)...
EA Inspection Report HZ 2013最新
EA Inspection Report HZ 2013最新_法律资料_人文社科_专业资料。EA LIVING ...The shipment released would be based on the final inspection result of ...
...by the China Entry-Exit Inspection_答案_百度高考
“The survey report issued by the China Entry-Exit Inspection and Quarantine Association will be taken as final and binding upon both parties.”最确切的...
REPORT ON INSPECTIONS & TESTS FINAL
REPORT ON INSPECTIONS & TESTS FINAL 隐藏>> 1. 1.1 INSPECTIONS AND TESTS General Each type of telescopic pole shall be subject to the tests as ...
更多相关标签: